-
Published11/03/2016
-
Deadline20/04/2016
-
Today19/07/2026
Utilities
- indicates CPV codes deduced from the text of the procedure
- indicates text translated automatically in your browsing language
Poland-Poznań: Downhole equipment
(1) Maximum push force: minimum of 18 tonnes.
(2) Maximum pulling force: minimum of 18 tonnes.
(3) Engine: minimum 140 KM Tier4.
(4) Maximum torque: minimum 7400 Nm.
(5) Maximum speed:minimum 200 rpm.
(6) Machinery weight: maximum 12 tonnes.
(7) Heated and air conditioned operator’s cabin.
(8) 3-driving transmission.
(9) anchored candles.
(10) Protection against electric shock.
(11) Automatic hydraulic feeder of drilling poles.
(12) A container on poles enabling rapid replacement of the complete kit.
(13) Flow meter with fluid flow control of drilling fluid.
(14) An anti-free system to protect the wash system against damage at low temperatures.
(15) Scrubbing pump with maximum expenditure:minimum 260 l/min.
(16) chassis on rubberised tracks (steel cells made of high strength steel, vulcanised with rubber on the outside side.
(17) Set of poles wholly forged in one piece.
(18) feeder slips with teflon liner.
(19) Automatic lubrication system for drilling rigs.
(20) A system for controlling drilling functions to program the operation cycle and to automate the drilling process.
(21) GPS management system.
34000000 - Transport equipment and auxiliary products to transportation
This content published on this page is meant purely as an additional service and has no legal effect. The Union's institutions do not assume any liability for its contents. The official versions of the relevant tendering notices are those published in the Supplement of Official Journal of the European Union and available in TED. Those official texts are directly accessible through the links embedded in this page. For more information please see Public Procurement Explainability and Liability notice.