DAL/DKW Etzelwerk - Construction and pressure line - EU tenders
DisplayCustomHeader
Procurement Detail Actions Portlet
OP Portal - Procurement - Details

This page contains content generated automatically to improve findability and accessibility

- indicates CPV codes deduced from the text of the procedure

- indicates text translated automatically in your browsing language

DAL/DKW Etzelwerk - Construction and pressure line Text automatically translated in your browsing language Automatically translated

  • Published
    29/07/2024
  • Deadline
    27/09/2024
  • Today
    12/12/2024
Status
Submission closed
Type of contract
Works
Subject for Renewal
Yes
Buyer
Chemins de fer fédéraux suisses CFF, Infrastructure, Achats, Supply Chain et production, Achats projets de construction, Emplacement Berne
Place of performance
NUTS code: Multiple place of performance
Location of buyer
NUTS code: CH021 Bern / Berne
Business sector (Main CPV)
45000000 Construction work
Total estimated contract value (excluding VAT)
Not available
Total final contract value (excluding VAT)
Not available
Tender reference number
16752079-3b3b-4ca4-a24d-6657215d85f6
Description

According to the new concession, the SBB will have to douse cold Sihlseewasser at the dam In den Schlagen in die Sihl on a monthly basis, with additional doping to achieve a minimum runoff in Sihlwald. The amount of doping water is to be used energetically in a doping power plant. If the amount of doping water exceeds the swallowing capacity of the turbine, the missing amount of water is discharged via a conical jet valve. The power plant and doping plant is located on the orographically left bank of the Sihl, directly at the foot of the dam wall. The planned doping plant connects to the existing base outlet above the base outlet shooters. In the context of this invitation to tender, the structural parts of the plant and the steel pressure line of the doping power plant and the doping plant will be procured. The machine house is placed in a pre-cut with nail wall at the foot of the dam wall. The steel pressure line is mounted upright in the excavated pipe tunnel (length approx. 40 m, excavation profile approx. 10 m2). Special excavation know-how is required for the steel-clad connection to the existing basic drainage tunnels. For the return structure, the existing bank wall is demolished and a construction pit with water drainage is erected in the Sihl. A crane (approximately 50 m outreach) is to be installed for the transport of equipment and building materials. People can only reach the construction site on foot. Installation places are available at the height of the dam crown. Construction is scheduled to start in autumn 2025. The assembly of the pressure line is expected to start in summer-autumn 2026 and construction and commissioning is scheduled for autumn 2027. Text automatically translated in your browsing language Automatically translated

Submission Method
Not available
Tenders may be submitted
Electronic submission: eu.europa.publications.PublicProcurement.electronic.submission.not-allowed
Information about a public contract, a framework agreement or a dynamic purchasing system (DPS)
Not available
Conditions for opening tenders (date)
Not available
Place of performance
CPV code
Award method
Criterion:
Type: quality
Description: Zuschlagskriterien
Weight (percentage, exact):
Estimated value
Not available
Final contracted value
Not available
Award of contract
Not available
Prior information
Contract
Award
Footnote - legal notice

This content published on this page is meant purely as an additional service and has no legal effect. The Union's institutions do not assume any liability for its contents. The official versions of the relevant tendering notices are those published in the Supplement of Official Journal of the European Union and available in TED. Those official texts are directly accessible through the links embedded in this page. For more information please see Public Procurement Explainability and Liability notice.