N01.12 MP-190067 - BSA Réf signal. surv. Bardonnex-Coppet - Renovation of the LS de GE (ID 11098) Text automatically translated in your browsing language Automatically translated
Note: Not all information for this procedure were successfully computed. Please consult linked documents for more details.
The lot described here is part of the overall project UeLS-CH UT II part of Geneva, whose work started in 2021 for the Computer AS, AR, rVL and BL as well as the HCI infrastructure. The lot will be integrated into the overall UeLS-CH UT II project so that the higher level systems (AS, AR, BL, rVL) can have the field information of the operational and safety equipment of the roads and tunnels bypassing Geneva. The BSA equipment will not be renewed as part of the project, the lot will have to establish interfaces with the existing equipment. The present Lot - Local Control System (LS) is intended to ensure the control of the installations of the following BSA sections: * Section Plan les Ouates (SPLO), Annexes E, B, BMT, DI * Section Confignon (SCONF), Annexes E, B, L, BMT, DI * Section Vernier (SVRN), Annexes E, B, L, BMT, DI * Section Aéroport (SAER), Annexes E, B, BMT, DI * Creation of RPH and DAW dossiers; * Retro-engineering of the control technology of the existing plants of the 4 BSA sections of the project; * Supply and installation of the LS and MESD of the 4 BSA sections of the project; * Supply of cabinets to supply the LS and MESDs; * Electrical connections of the cabinets; * Manufacture of cable connections between existing cabinets; * Integration of LS and MESD into existing cabinets; * The development of the LS for the 4 BSA sections of the project; * Qualification of the software (monitoring of requirements, carrying out platform and location tests); * The introduction and commissioning of the LS on site in several steps; * Carrying out work in the technical rooms (approximately 30 technical buildings); * The dismantling of the obsolete elements at the end of the project. Commissioning takes place in several steps. Each stage is migrated one by one, each stage requires nocturnal interventions with complete or partial closure. Work is underway on an important road infrastructure with high traffic volumes (more than 80,000 FZ/24h), which is connected to the European motorway network and serves the agglomeration of Geneva as well as sites of national importance. Text automatically translated in your browsing language Automatically translated
tdf-non-av
45316210 - Installation of traffic monitoring equipment
34996000 - Control, safety or signalling equipment for roads
71300000 - Engineering services CVP code deduced from the text of the procedure AI-generated
71000000 - Architectural, construction, engineering and inspection services CVP code deduced from the text of the procedure AI-generated
This content published on this page is meant purely as an additional service and has no legal effect. The Union's institutions do not assume any liability for its contents. The official versions of the relevant tendering notices are those published in the Supplement of Official Journal of the European Union and available in TED. Those official texts are directly accessible through the links embedded in this page. For more information please see Public Procurement Explainability and Liability notice.