Published26/12/2023
-
Deadline30/01/2024
-
Today17/08/2026
Utilities
Biogas plant - design and build contract - technology and civil works - Rå Biopark
Note: Not all information for this procedure were successfully computed. Please consult linked documents for more details.
Rå Biopark shall build a biogas plant. The plant and construction site are in Storfjord municipality, in Skibotn, approximately two hours' drive from the city of Tromsø. The supplier that is awarded this design and build contract has a complete and overall responsibility to deliver a complete and well-functioning biogas plant according to the requirements specification and contract terms in this competition. This responsibility includes processes, machinery, equipment, technical support systems, technology and construction works necessary to produce liquid biogas as described in the specification. The supplier is responsible for delivering everything needed to make the biogas plant work. This includes, but is not limited to, the entire process from planning and engineering to construction and follow-up during the defect notification/complaint period. The Supplier is responsible for all engineering, materials, machinery and equipment needed to fulfil the Client's needs for a functioning biogas plant that meets all agreed requirements. The Supplier is also responsible for providing infrastructure at the construction site and building elements such as electricity and technical systems, pipes, water and sewage, control systems, odour management systems, fire alarm systems, etc. The supplier has full responsibility for the interface between all parts of the biogas plant that are relevant to the contract, including the building and construction work (the construction part). The Supplier shall be responsible for testing the plant, and follow-up during the complaint period, as well as training the Client's personnel to operate the plant. The supplier is encouraged to familiarise itself with the entire requirements specification (Appendix A) even if not all parts (lots/systems) apply to this EPC contract.The requirements specification is largely function-based, so it is up to the Supplier to find good solutions that fulfil the Client's described requirements and needs. The contract is based on the Norwegian standard contract NS 8407, which applies as general contractual provisions, with special provisions in addition.
https://eu.eu-supply.com/app/rfq/rwlentrance_s.asp?PID=389995&B=
https://eu.eu-supply.com/app/rfq/rwlentrance_s.asp?PID=389995&B=
45255800 - Gas-production plant construction work
45210000 - Building construction work
44622000 - Heat-recovery systems
71323200 - Plant engineering design services
45200000 - Works for complete or part construction and civil engineering work
45223000 - Structures construction work
45350000 - Mechanical installations
45220000 - Engineering works and construction works
45222100 - Waste-treatment plant construction work
09000000 - Petroleum products, fuel, electricity and other sources of energy
90513000 - Non-hazardous refuse and waste treatment and disposal services
51810000 - Installation services of tanks
51900000 - Installation services of guidance and control systems
45100000 - Site preparation work
45255000 - Construction work for the oil and gas industry
45400000 - Building completion work
42000000 - Industrial machinery
42514000 - Machinery and apparatus for filtering or purifying gases
90000000 - Sewage, refuse, cleaning and environmental services
42520000 - Ventilation equipment
71320000 - Engineering design services
51500000 - Installation services of machinery and equipment
71800000 - Consulting services for water-supply and waste consultancy
45351000 - Mechanical engineering installation works
90510000 - Refuse disposal and treatment
45300000 - Building installation work
This content published on this page is meant purely as an additional service and has no legal effect. The Union's institutions do not assume any liability for its contents. The official versions of the relevant tendering notices are those published in the Supplement of Official Journal of the European Union and available in TED. Those official texts are directly accessible through the links embedded in this page. For more information please see Public Procurement Explainability and Liability notice.