-
Published03/12/2025
-
Deadline16/12/2025
-
Today21/05/2026
Utilities
- indicates CPV codes deduced from the text of the procedure
- indicates text translated automatically in your browsing language
Support wall with underground cable construction and deep drainage section 5902, km 9.125 - km 9.950
Note: Not all information for this procedure were successfully computed. Please consult linked documents for more details.
New construction of a beam plank wall with reinforced concrete facing shell with a length of 48m on the left side of the track. In addition, the measure includes the construction of a underground cable construction system between Signal V52 (km 9.157) and Signal 54 (km 9.950), as well as the new construction of edge paths and drainage facilities between EÜ km 9.197 and the platforms at km 9.450.
https://bieterportal.noncd.db.de/evergabe.bieter/api/supplier/external/deeplink/subproject/653d4dbe-3cff-44f2-a705-4cf1e73a5799
https://bieterportal.noncd.db.de/evergabe.bieter/api/supplier/external/deeplink/subproject/653d4dbe-3cff-44f2-a705-4cf1e73a5799
45221000 - Construction work for bridges and tunnels, shafts and subways
45234000 - Construction work for railways and cable transport systems
This content published on this page is meant purely as an additional service and has no legal effect. The Union's institutions do not assume any liability for its contents. The official versions of the relevant tendering notices are those published in the Supplement of Official Journal of the European Union and available in TED. Those official texts are directly accessible through the links embedded in this page. For more information please see Public Procurement Explainability and Liability notice.