-
Published06/11/2024
-
Deadline20/11/2024
-
Canceled26/11/2024
-
Today10/07/2025
Utilities
- indicates text translated automatically in your browsing language
Preparation of design documentation for construction works along with author's supervision for the Project entitled: Development of design documentation for the construction of a new traction substation Marszowice and a new section cabin Rawka, planned for implementation under the Project entitled: "Construction of the new Podłęże – Szczyrzyc – Tymbark/Mszana Dolna railway line and modernisation (...)" Text automatically translated in your browsing language Automatically translated
Note: Not all information for this procedure were successfully computed. Please consult linked documents for more details.
The purpose of performance of the Contract is to provide the Ordering Party, within the deadlines specified in the Material and Financial Schedule, with design documentation (concept, construction design, technical design and executive design (as a supplement to the technical design)) necessary for the proper performance of all construction works together with the opinions, arrangements, approvals, conditions, administrative decisions necessary to carry out construction works and the provision of services provided at the tender stage and at the construction works stage. The main results of the Order are: 1) the Variant Programming and Spatial Concept (KPP) along with the timetable for the implementation of the task; 2) architectural and construction projects, land development projects, technical projects, executive projects (as a supplement to the technical project) together with geotechnical and geological-engineering documentation and any other documentation necessary to obtain consents, opinions and permits for the implementation of the task; 3) Materials necessary to obtain a decision on environmental conditions referred to in the Act of 3 October 2008 on the provision of information on the environment and its protection, public participation in environmental protection and environmental impact assessments (i.e. OJ Journal of Laws 2024, item 1112 as amended) – hereinafter referred to as the ‘Act on the provision of information on Wednesday’ 4) A set of materials necessary to obtain building permits together with obtaining the building permits themselves or a certificate of non-objection confirming the declaration of intention to carry out construction works, including, inter alia: reports on the environmental impact of the project as part of the re-assessment of the environmental impact – if a re-assessment of the environmental impact is required. At the same time, it should be borne in mind that if a decision on environmental conditions is obtained after an environmental impact assessment has been carried out, it is not possible to carry out works built under the procedure of submitting works; 5) Tender materials necessary to select contractors for construction works (i.e. bill of quantities based on the NRP, investor's cost estimate, STWiORB), PFU prepared on the basis of the base document in force at PKP Polskie Linie Kolejowe S.A. and modified by the Contractor for industries related to the construction of a traction substation and a section cabin and other accompanying industries, e.g. telecommunications) and participation in the tender procedure for the selection of the contractor for works by preparing and providing the Contracting Authority with answers to questions asked during the tender procedure for the award of a public contract for the implementation of construction works, until the conclusion of the contract with the Contractor for Works and the necessary modifications to the documents resulting from these questions; 6) Certification at the stage of designing and signing a contract with a notified body within 1 month after the date of signing the contract; 7) Final building permits; 8) Other necessary documents necessary for the execution of construction works (e.g. water and legal permits and other decisions, if required) including energy certificates for the resulting facilities. Detailed Description of the Subject of the Order can be found in Volume III SWZ - OPZ. Text automatically translated in your browsing language Automatically translated
www.platformazakupowa.plk-sa.pl
www.platformazakupowa.plk-sa.pl
Type: price
Description: 1. W celu wyboru najkorzystniejszej oferty Zamawiający przyjmuje następujące kryteria - Całkowita cena brutto: waga 100 %. 2. Zamawiający uzna za najkorzystniejszą ofertę niepodlegającą odrzuceniu, która otrzyma największą łączną sumę punktów.
Weight (percentage, exact):
This content published on this page is meant purely as an additional service and has no legal effect. The Union's institutions do not assume any liability for its contents. The official versions of the relevant tendering notices are those published in the Supplement of Official Journal of the European Union and available in TED. Those official texts are directly accessible through the links embedded in this page. For more information please see Public Procurement Explainability and Liability notice.