Published06/12/2014
-
Deadline16/02/2015
-
Awarded12/05/2015
-
Today06/08/2026
Utilities
- indicates CPV codes deduced from the text of the procedure
- indicates text translated automatically in your browsing language
Denmark-Copenhagen: Works for complete or part construction and civil engineering work
The contract is part of 1052 Greve South – Køge, which forms part of the E20 Køge Bugt motorway.
The main features of the contract are as follows:
— Soil, drainage, sediment, stabilge, asphalt, garbage, bridging and marking works
approximately 3.2 km of motorway extension, four ramps (approx. 1.5 km), approximately 1 km of municipal roads
— New bridge 0010-0-079.80 UF of rail, sidings Køge St.
— New bridge 0010-0-081.90 OF of L-VEJ 533, New Lyngvej
— Demolition of bridge 0010-0-079.00 OF of K-VEJ 21, Storage road
— Demolition of bridge 0010-0-082.00 OF of L-VEJ 533, Lyngvej
— Extension of bridge 0010-0-080.00 UF of runway, Roskilde-Coke – Næstved
— Extension, reinforcement and conversion of bridge 0010-0-084.00 UF of Bellingestien
— Replacement of canisters and raising of bridge 0010-0-085.00 OF of K-VEJ 16, Ølbyway
— Reinforcement and re-insulation of bridge 0010-0-086.00 OF of P-VEJ, Pilegårdsvej
— Extension of bridge 0250533-0-117.00 UF of walking and cycling path (Lyngway pitch)
— Installation of approximately 2.750 m new noise screen
— Installation of marking equipment
— Construction of street lighting facilities on Lyngvej and NordHigh and on two paths (Bellingestien; and
Sliding path)
— The construction of signalling facilities in the two ramp crossings at TSA 32 Køge (western and eastern) and in the crossing of North High/
Central road and crossed P site/Karlemosevej
— Establishment of 4 rainwater basins
— Construction of permanent redeployment sites in ramp gradients at TSA32;
The main quantities of the contract are as follows:
approx. 60 000 m³ of crude earth works
approximately 40 000 m³ of supply of built-in raw soil
approx. 13 500 m³ Lighthouse work
approx. 40 000 m³ of mula seed
approx. 37 000 m³ bottom protection gravel
approximately 24 000 m³ of stable gravel
approx. 35 000 m³ of topping
approximately 20 000 m drainage lines
approximately 21 000 m² of asphalt mining
approx. 51 000 t asphalt
approx. 2 000 m bridging, edge limitation
approximately 4 500 m² of paving, granite chaussé
approximately 12 500 m steel furnace
approx. 10 000 m markings on the lane
approximately 93 000 m² of grass mowing
approx. 700 t slack armour
approx. 1 100 m tension
approx. 6 000 m³ of concrete
approximately 4 000 m² of moisture solation/bridge coatings
approx. 1 200 m bridge harness
90 pieces of road signs
14 head directories and sign plates
12 exit and tabular directories on ordinary road.
45200000 - Works for complete or part construction and civil engineering work
45221000 - Construction work for bridges and tunnels, shafts and subways
45233000 - Construction, foundation and surface works for highways, roads
This content published on this page is meant purely as an additional service and has no legal effect. The Union's institutions do not assume any liability for its contents. The official versions of the relevant tendering notices are those published in the Supplement of Official Journal of the European Union and available in TED. Those official texts are directly accessible through the links embedded in this page. For more information please see Public Procurement Explainability and Liability notice.