Framework agreement for the delivery of biogas with the construction and operation of a filling station.
Note: Not all information for this procedure were successfully computed. Please consult linked documents for more details.
The contracting authority has entered into a framework agreement with one tenderer. This tenderer shall build and operate a filling station at the contracting authority ́s site for the delivery of compressed biogas (CBG), which shall be used exclusively by the Contracting Authority's refuse collection vehicles. The procurement includes the following main points: 1 Delivery of compressed biogas: The tenderer shall ensure continual supply of biogas in accordance with the contracting authority ́s needs. The biogas shall be transported and stored using flakes that the tenderer owns and maintains.2 Establishment of a filling station: The tenderer shall build a filling station facility. Quick filling (solid-fill) via compressor and dispenser. Slow filling (slow-fill) with parking places for refuse collection vehicles. Infrastructure for safe storage and handling of flakes with biogas shall be established.3 Operation and maintenance: The tenderer is responsible for the operation, maintenance and insurance of the plant for the entire contract period. Service agreements shall be signed to ensure continual functionality and security. At the end of the contract, the plant shall be transferred free of charge to the contracting authority, with a registered mortgage right that ensures the contracting authority's ownership.4 Exclusive use: The installation shall only be used by the contracting authority, and it is not allowed to sell biogas to private or other actors.5 Security requirements: The installation must be in accordance with the current regulations, including ATEX directives and Norsk Gassnorm.Security distances, risk handling and technical barriers shall be implemented based on previous. risk assessments. It is the requirement specification that applies, the extract above is only meant as an introduction.
https://permalink.mercell.com/254549296.aspx
https://permalink.mercell.com/254549296.aspx
09000000 - Petroleum products, fuel, electricity and other sources of energy
71320000 - Engineering design services
45255800 - Gas-production plant construction work
45200000 - Works for complete or part construction and civil engineering work
45231220 - Construction work for gas pipelines
Type: price
Description: The price will be evaluated based on the completed price form.
Weight (percentage, exact): 60
Criterion: Manager
Type: quality
Description: CVs shall be submitted for the offered project manager. The project manager shall follow the project. CVs shall have a maximum of 3 A4 pages, including reference projects. It shall contain the following information: - The Project Manager's name and position. - Work experience and education. - Up to 3 relevant reference projects More emphasis will be put on the reference projects than formal competence and work experience. Relevant reference projects aim at projects of the same nature, size and character as this. Projects where coordination with other contractors has been necessary will also be weighted positively.
Weight (percentage, exact): 10
Criterion: Environment - concrete and transport
Type: quality
Description: The criterium is divided into two sub-criteria: Concrete and transport of biogas. Transport is weighted twice as much as concrete. Further details on the documentation and evaluation of these criteria can be found in points 8.1 and 8.2.
Weight (percentage, exact): 30
This content published on this page is meant purely as an additional service and has no legal effect. The Union's institutions do not assume any liability for its contents. The official versions of the relevant tendering notices are those published in the Supplement of Official Journal of the European Union and available in TED. Those official texts are directly accessible through the links embedded in this page. For more information please see Public Procurement Explainability and Liability notice.