Publications Office of the EU
Bydgoszcz Agglomeration Bike 2025 - EU tenders
DisplayCustomHeader
Procurement Detail Actions Portlet
OP Portal - Procurement - Details

This page contains content generated automatically to improve findability and accessibility

- indicates CPV codes deduced from the text of the procedure

- indicates text translated automatically in your browsing language

Bydgoszcz Agglomeration Bike 2025 Text automatically translated in your browsing language Automatically translated

  • Published
    02/12/2024
  • Deadline
    08/01/2025
  • Opening of tenders
    08/01/2025
  • Today
    14/01/2025
Status
Submission closed
Type of contract
Services
Subject for Renewal
No
Buyer
Zarząd Dróg Miejskich i Komunikacji Publicznej w Bydgoszczy
Place of performance
NUTS code: Multiple place of performance
Location of buyer
NUTS code: PL613 Bydgosko-Toruński
Business sector (Main CPV)
50111000 Fleet management, repair and maintenance services
Total estimated contract value (excluding VAT)
Not available
Total final contract value (excluding VAT)
Not available
Tender reference number
NZ.2531.57.2024
Description

1. The subject of the contract is a service consisting in the start-up, management and comprehensive maintenance of the Bydgoszcz Agglomeration Bike system (hereinafter BRA), using the equipment and infrastructure of the Ordering Party (bikes, stations) in such a way that each eligible customer can rent a bike, on the following principles: a) The Contractor will launch the BRA System and will provide a service consisting in the management and comprehensive maintenance of the BRA System in the period from the date of launch of the BRA System to the date of termination of the Agreement, b) the BRA System is to operate on a 24/7 basis during the period from 1 March to 31 October 2025, c) the BRA System will be publicly available, which means providing all interested parties with the same rules for obtaining the status of the Customer of the BRA System and the transparency of the rules for using the rental service, d) the BRA System is to enable its Customers to self-service rental and return bicycles without the obligation to make a refund at the same station where the rental took place, e) During the term of the Agreement, the Contractor will launch and ensure the operation of at least 53 bicycle stations and not less than 360 bicycles. 2. A detailed description of the subject of the contract, the scope and conditions of performance of the contract are described in the draft provisions of the Agreement with attachments, constituting Annex No. 1 to the SWZ, including: 1) description of the subject of the contract (hereinafter: OPZ), constituting Annex No. 2 to the Agreement and in the model for the valuation of the service, constituting Annex No. 3 to the SWZ. 3. The contracting authority shall require an offer to be submitted after the contractor has carried out an on-site inspection. The required on-site visit consists of two parts: 1) getting acquainted with the type and technical condition of bicycles (used equipment) in the ZDMiKP warehouse, at ul. Witebska 5 in Bydgoszcz, in two dates to choose from: - term 1: 11.12.2024, 11:00 – 12:00, - deadline 2: 12.12.2024, 11:00 – 12:00, 2) getting acquainted with the construction and technical solutions of existing bicycle stations, on the example of a bicycle station located in Bydgoszcz, at ul. Kaliskiego / University of Technology, in two dates to choose from: - term 1: 11.12.2024, 12:30 – 13:30, - Deadline 2: 12.12.2024, 12:30 – 13:30, All bike stations covered by the contract have the same technical solutions and operate in the same way. The Contractor may, in addition to the required vision of the sample station, independently make a vision of other selected stations. The route recommended by the Ordering Party between the warehouse and the location of the sample bicycle station is given in Annex 4.2 to the SWZ (map). The required on-site visit will take place in the presence of the Contracting Authority Representative, who will draw up two attendance lists for the participants, respectively, for each of the two parts of the visit. The document of power of attorney of the persons representing the Contractor to participate in the vision should be handed over to the Representative of the Contracting Authority. During the vision, the Purchaser will not answer the contractors' questions. Communication of contractors with the Ordering Party takes place only in accordance with the principles described in Chapter VIII of the SWZ. In addition, a declaration by the Contractor that an on-site inspection has been carried out will be required in addition to the tender (the model declaration is attached as Annex 4.1 to the SWZ). The declaration shall be submitted by at least one of the economic operators jointly applying for the contract. Failure to participate in the on-site visit described above disqualifies the Contractor and will result in the rejection of the offer. 4.Customer, in accordance with Art. 1 PPL, requires the contractor or subcontractor to employ in the performance of the contract (during the entire duration of the contract) for an employment contract within the meaning of the provisions of the Labour Code (Article 22 § 1), persons performing during the performance of the contract: 1) relocation of bicycles and activities to ensure an appropriate number of bicycles at stations, 2) maintenance, repair, service of bicycles and stations, 3) operation of the "Contact Centre" A detailed description of the requirements of the Ordering Party in this respect is provided in the draft provisions of the contract, which are Annex 1 to the EMS. 5.The Contractor may entrust the performance of part of the contract to a subcontractor, taking into account the prohibition described in point V.11. SWZ. As far as subcontracting is concerned, the provisions of Articles 462-465 of the Public Procurement Law shall apply. The Contractor must indicate in the Tender and in the ESPD the proportion (in % or material scope) of the contract which he intends to subcontract and, if known, the names of any subcontractors. The absence of a declaration by the contractor in this respect will mean that the contractor intends to carry out the entire contract on its own. The Contractor shall be liable for the actions, omissions and negligence of the subcontractor as for his own actions. 6. The contracting authority does not provide for the award of contracts referred to in Art. 1 point 7 of the PPL. 7. The contracting authority shall not allow partial tenders to be submitted. The contracting authority shall not divide the contract into lots. Justification for not dividing the contract into lots: From an economic, operational and technical point of view, it is justified to award the service to one entity and not to divide the contract into lots, because: 1) division into lots would probably increase the cost of the task, as each of the Contractors would have to perform the same tasks, e.g. launch a mobile application, website, Contact Centre and IT system, etc., 2) division into lots would create problems for users, as they would probably have to use different applications, websites, Contact Centre, etc. The lack of division into lots does not limit access to the contract for economic operators from the sector of small and medium-sized enterprises (SMEs). Text automatically translated in your browsing language Automatically translated

Submission Method
Electronic via:
https://platformazakupowa.pl/transakcja/1024113
Tenders may be submitted
Electronic submission: required
https://platformazakupowa.pl/transakcja/1024113
Information about a public contract, a framework agreement or a dynamic purchasing system (DPS)
Not available
Conditions for opening tenders (date)
08/01/2025 10:20
Place of performance
Award method
Cena
Estimated value
Not available
Final contracted value
Not available
Award of contract
Not available
Prior information
Contract
Award
Footnote - legal notice

This content published on this page is meant purely as an additional service and has no legal effect. The Union's institutions do not assume any liability for its contents. The official versions of the relevant tendering notices are those published in the Supplement of Official Journal of the European Union and available in TED. Those official texts are directly accessible through the links embedded in this page. For more information please see Public Procurement Explainability and Liability notice.