Published03/07/2024
-
Deadline19/08/2024
-
Opening of tenders19/08/2024
-
Today11/10/2026
Utilities
- indicates CPV codes deduced from the text of the procedure
- indicates text translated automatically in your browsing language
Söse Nord II - Renewal section Melchiorshausen to Erichshof
Harzwasserwerke GmbH has been operating the Söse Nord drinking water transport pipeline since 1936, through which a supra-regional supply of drinking water takes place between the Sösetalsperre in the Harz Mountains and the Hanseatic city of Bremen. Due to the old age of the existing steel line (DN 450), a renewal is planned for the line section from Melchiorshausen to Brinkum. The route of the new line is continuously located in the carriageway area of Bundestraße 6. Only at the junction of the two waters of Gänsebach and Hombach does the new line swivel outside the carriageway in order to cross the waters parallel to the existing bridge structures. It is planned to relay a butt-seam welded steel pipeline (ZMPE) DN 600 (610 mm x 6.3 mm) with PPS over a length of approximately 4,060 m in the road body of the B6 as a replacement for the line DN 450 from the 1936s. Parallel to the cable, a telecommunications cable and a cable drain pipe DN 50 are laid. The drinking water supply is ensured during the construction project via the existing pipe. After hygienically perfect production and commissioning of the new line, the existing line is filled and remains in the ground. Parts of the existing pipeline to be expanded are disposed of as waste. The fan and emptying shafts on the section are demolished and rebuilt on the new line. The existing transfer points and the Leeste large valve shaft will be dismantled. The crossroads of the Gänsebach and the Hombach are being rebuilt in an open construction. The new installation requires earthworks, civil engineering, roadworks and pipeline construction, including water management. The water pipe must be installed under confined conditions. During the construction work, diversion routes must be set up and maintained. The road body (asphalt) shall be restored on half-side after the construction of the pipeline.
https://www.subreport.de/E24671841
https://www.subreport.de/E24671841
45231110 - Pipelaying construction work
45221000 - Construction work for bridges and tunnels, shafts and subways
44100000 - Construction materials and associated items
44160000 - Pipeline, piping, pipes, casing, tubing and related items
45233000 - Construction, foundation and surface works for highways, roads
This content published on this page is meant purely as an additional service and has no legal effect. The Union's institutions do not assume any liability for its contents. The official versions of the relevant tendering notices are those published in the Supplement of Official Journal of the European Union and available in TED. Those official texts are directly accessible through the links embedded in this page. For more information please see Public Procurement Explainability and Liability notice.