(PTS-446) roundabout node design Text automatically translated in your browsing language Automatically translated
Note: Not all information for this procedure were successfully computed. Please consult linked documents for more details.
design contract for the planning of a roundabout junction at the intersection of Gidófalvy Lajos utca – Kassák Lajos utca – Apály utca – preparation of permit and construction plans • site visit; • geodetic survey and basic mapping; • traffic monitoring of the area; • preparation of road construction and traffic engineering licensing and construction design documents; • preparation of a utilities plan, carrying out utilities consultation in the e-utilities system; • planning and licensing of necessary utilities replacements; • preparation and coordination of green space planning and landscape architectural work; • preparation of temporary traffic engineering status plans during construction; • carrying out road traffic counting and pedestrian counting (weekday morning and afternoon peak hours from 7 a.m. to 10 p.m. to 4 p.m. to 7 p.m. to 7 p.m. to 7 p.m. to 7 p.m. to 7 p.m. to 7 p.m. to 7 p.m. to 7 p.m.) • planning rainwater drainage using existing sinkholes or designing new network elements; • planning the relocation of sinkholes, if necessary, and agreeing with FCsM's service providers (acquiring management and utilities contributions for a professional plan); • reviewing public lighting, metering and planning extensions as necessary; • planning tasks related to cycling facilities; • obtaining the necessary management, operator and official permits for establishment; • preparing an unpriced budget announcement and a planner's cost estimate; • involvement of the designer in the preparation of the construction, and the supervision of the designer; • preparation and authorisation of the owner/manager/operator (TKÜ) plan, obtaining consents; • Obtaining a road construction permit. The roundabout should be planned by eliminating as few parking spaces as possible. The area covered by the design is 1 275 m2. AK is the procedure of the Kbt. It shall be conducted as a conditional public procurement procedure pursuant to Section 53(5). Uncertain future event beyond the control of the AE: In the case of appropriations not committed in 2024, the decision of the representative body shall be required to provide the necessary financial cover for the present procurement need in 2025 from the resulting balance. The decision of the representative body is expected at the end of April 2025. If the representative body does not provide the necessary funds, the Contracting Authority shall be entitled to award the public procurement procedure to the Public Procurement Office. Pursuant to Section 75(2)(a) of the Public Procurement Act, it shall be declared ineffective, or In accordance with Section 131(9) of the Civil Code, it is exempt from the obligation to conclude a contract. In the event of a contract being concluded, the Kbt. In accordance with Section 135(12), the entry into force of the contract is subject to the availability of financial collateral. Text automatically translated in your browsing language Automatically translated
https://ekr.gov.hu/eljarastar/eljaras/EKR000038212025
https://ekr.gov.hu/eljarastar/eljaras/EKR000038212025
Type: quality
Description: 2. az M2.1. szerinti szakember szakmai többlettapasztalata (további … hónap, min. további 0 hónap, max. további 24 hónap, előny a több)
Weight (percentage, exact): 20
Criterion:
Type: quality
Description: 3. az M2.2. szerinti szakember szakmai többlettapasztalata (további … hónap, min. további 0 hónap, max. további 24 hónap, előny a több)
Weight (percentage, exact): 10
Criterion:
Type: quality
Description: 4. az M2.3. szerinti szakember szakmai többlettapasztalata (további … hónap, min. további 0 hónap, max. további 24 hónap, előny a több)
Weight (percentage, exact): 10
Criterion:
Type: quality
Description: 5. az M2.4. szerinti szakember szakmai többlettapasztalata (további … hónap, min. további 0 hónap, max. további 24 hónap, előny a több)
Weight (percentage, exact): 10
Criterion:
Type: price
Description: 1. nettó ajánlati összár (HUF, előny a kisebb)
Weight (percentage, exact): 50
This content published on this page is meant purely as an additional service and has no legal effect. The Union's institutions do not assume any liability for its contents. The official versions of the relevant tendering notices are those published in the Supplement of Official Journal of the European Union and available in TED. Those official texts are directly accessible through the links embedded in this page. For more information please see Public Procurement Explainability and Liability notice.