"Engineering (design, construction and author's supervision) for the construction of a waste water treatment plant (WWTP), sewerage and water supply networks in the village of Nikolovo, Ruse region, Ruse municipality - first stage"
Note: Not all information for this procedure were successfully computed. Please consult linked documents for more details.
The subject of this contract is Engineering – design, construction and supervision during the execution of the works. Within the framework of the procedure, a contractor will be selected for the implementation of engineering - design, construction works and author's supervision for the construction of a Waste Water Treatment Plant (WWTP) and sewerage and water supply network of the village of Nikolovo, Ruse District, Ruse Municipality. The procurement in the part of the investment project should cover the whole site and be divided into two stages so as to allow phased construction. First stage: Construction of a waste water treatment plant, construction of a main sewerage branch 1 along Lipnik Street and Pliska Street, Nikolovo village, with a length of about 4 355 l.m. and replacement of an existing water supply line 150 mm AC with F160 mm PAW, with a length of about 4 000 l.m. Second stage: construction of sewerage and water supply network of the rest of the settlement within the boundaries of the urbanized territory (without main branch 1) with a length of about 32 097 l.m. The public procurement in the part of the construction covers only the first stage: Construction of a waste water treatment plant and the construction of a main sewerage branch 1 along Lipnik Street and Pliska Street, Nikolovo village, with a length of approximately 4 355 l.m. and replacement of an existing water supply line 150 mm AC with F160 mm PAW, with a length of approximately 4 000 l.m. The total time for the execution of the contract is up to 1080 calendar days), divided as follows: The deadline for the preparation of the technical design is up to 180 calendar days from the date of receipt of the Assigning Letter from the Assignor to the Contractor for the start of the design activity. The deadline for the completion of construction works is 900 calendar days from the signing of the Protocol on the opening of the construction site and the determination of the construction line and construction level – according to the model in accordance with Ordinance No 3/31.07.2013 on the drawing up of acts and protocols during construction and ends with the drawing up of a statement of findings establishing the suitability for acceptance of the construction (Annex No 15 to Article 7(3)(15) of Ordinance No 3 of 31 July 2003 on the drawing up of acts and protocols during construction). The deadline for exercising author's supervision is from the opening of the construction site, certified by drawing up a Protocol for the opening of the construction site and for determining the construction line and level, until the signing of the statement of findings establishing the suitability for acceptance of the construction. Specifications: The time for the implementation of the contract does not include the time of review of the submitted investment project, the time for coordination with the competent authorities/persons and operating companies of the prepared investment project, as well as the time required for the assessment of compliance under Article 142(6)(2) of the Spatial Development Act, as well as any other coordination periods and such for the issuance of the relevant permits; The period for the implementation of Action 2 may be suspended in the presence of the legislative prerequisites and in compliance with the established procedure for this;
https://app.eop.bg/today/500949
https://app.eop.bg/today/500949
This content published on this page is meant purely as an additional service and has no legal effect. The Union's institutions do not assume any liability for its contents. The official versions of the relevant tendering notices are those published in the Supplement of Official Journal of the European Union and available in TED. Those official texts are directly accessible through the links embedded in this page. For more information please see Public Procurement Explainability and Liability notice.