-
Published08/11/2024
-
Today08/12/2024
-
Deadline09/12/2024
Utilities
- indicates text translated automatically in your browsing language
IBW Modernization and Extension Kindergarten and Family Center in Trossingen Text automatically translated in your browsing language Automatically translated
Note: Not all information for this procedure were successfully computed. Please consult linked documents for more details.
The kindergarten Regine Jolberg has a long tradition in Trossingen. For many years, the kindergarten was run by the nuns of Nonnenweiher. The building dates back to 1928. Since 2013, the facility has been a family center, which means that extended family-supporting and child-promoting services are offered. For this purpose, the kindergarten cooperates with various specialist departments, such as speech therapy or occupational therapy. In addition, care services for families are offered. In the kindergarten there are 4 kindergarten groups, one of which is an inclusion group, which was created with the rainbow kindergarten Tuttlingen. The kindergarten groups are located on the first and second floors of the building. In the attic there are small group rooms. Now the toilet facilities have been in need of renovation for years. However, since the toilet rooms no longer meet the minimum measures of the KVJS in terms of the number of toilets and sinks, and the cloakrooms have always been very cramped, the expansion of the building to the north was now planned. Here, the toilet facilities can be designed according to today's specifications of the KVJS, the cloakrooms can also be enlarged. In addition, new personal toilets will be created as well as a changing area with shower on each floor. A staff room is also planned in the DG, which serves as a break and meeting room for the educators. In the train of the extension building, an elevator is installed in the extension, so that all floors can be accessed barrier-free. In the course of the expansion, the energetic renovation of the outer shell, as well as a PV system on the roof is planned. A preliminary draft for the enlargement measure has already been prepared. Estimated schedule: At this stage, construction is scheduled to begin in October 2025 and to be completed in autumn 2026. Currently, a total gross budget of EUR 1.8 million (KG 300 + KG 400) has been set. (Extension construction: KG 300 – EUR 1,030,000 gross, KG 400 – EUR 450,000 gross / energy refurbishment: KG 300 – EUR 255,000 gross, KG 400 – EUR 110,000 gross). The commissioning takes place depending on the project approval by the municipal council of the city of Trossingen within the framework of call-off contracts. The contractor is obliged to take over the service up to and including service phase 9 according to HOAI if the project is realized. The client intends to commission the services in stages. There is no legal claim to the transfer of all performance levels. For the submission of the request to participate, the request for participation specified by the contracting authority must be used and completed. Text automatically translated in your browsing language Automatically translated
https://www.subreport.de/E91863543
https://www.subreport.de/E86814252
This content published on this page is meant purely as an additional service and has no legal effect. The Union's institutions do not assume any liability for its contents. The official versions of the relevant tendering notices are those published in the Supplement of Official Journal of the European Union and available in TED. Those official texts are directly accessible through the links embedded in this page. For more information please see Public Procurement Explainability and Liability notice.