-
Published03/10/2025
-
Deadline04/11/2025
-
Awarded10/12/2025
-
Today12/05/2026
Utilities
- indicates CPV codes deduced from the text of the procedure
- indicates text translated automatically in your browsing language
1H0007, new building fire brigade Ahrweiler - 069 elevator
New construction of the fire brigade Ahrweiler: The current building of the volunteer fire brigade Ahrweiler on Ramersbacher Straße opposite the Ahrtores was severely damaged by the flood in 2021. The remaining torso can no longer be refurbished, so that a replacement building with 12 parking spaces is to be realized elsewhere. The new location south of the Ahr is within sight of today's fire station. The relocation of the fire brigade building is intended to ensure the accessibility of all areas in the future, even in the event of extreme flooding by the fire brigade. This list of services includes: Delivery, installation and commissioning of a machine roomless passenger lift (1000 kg/13 pers.), two stops, v=approx. 1.0 m/s, delivery height approx. 3.63 m; Installation in wooden shaft (light SB 1.80 m / ST 2.46 m, SG 1.25 m, SK 3.25 m); incl. shaft equipment, emergency call, shaft smoking, documentation and acceptances
https://plattform.aumass.de/Veroeffentlichung/av26657d-eu
https://plattform.aumass.de/Veroeffentlichung/av26657d-eu
71000000 - Architectural, construction, engineering and inspection services
This content published on this page is meant purely as an additional service and has no legal effect. The Union's institutions do not assume any liability for its contents. The official versions of the relevant tendering notices are those published in the Supplement of Official Journal of the European Union and available in TED. Those official texts are directly accessible through the links embedded in this page. For more information please see Public Procurement Explainability and Liability notice.