-
Published14/02/2025
-
Deadline17/03/2025
-
Today25/03/2025
Utilities
- indicates text translated automatically in your browsing language
Newly built town house Kannenberg, Primstal Text automatically translated in your browsing language Automatically translated
The subject of this procurement procedure is all structural design services in accordance with Part 4, Section 1, HOAI 2021, which are required to plan and execute the new building of the Bürgerhaus Kannenberg. A site visit is possible. Sustainability certification according to the criteria of the German Sustainable Building Council (DGNB) is sought. The enclosed room and function program shows how the use of the new building is planned. In a preliminary measure, the existing building will be dismantled. On the ground floor of the town house, a generous opening to the schoolyard is desired, which creates a connection to the outside area. From the upper floor, a pedestrian connection to the multi-purpose hall is to be provided, which allows direct access to the facilities there. Both levels of the building are to be accessible barrier-free. In addition to the boundary conditions under building law, the newly developed building concept on the property must take into account the open space design, media technology access, barrier-free access, delivery and disposal, the rescue route situation, fire brigade access and parking areas as well as parking areas. In the immediate vicinity are the primary school of the municipality of Nonnweiler – Dependance Primstal, the school gymnasium, the multi-purpose hall, the DRC. It is possible that the municipality of Nonnweiler is developing a local heating concept, which could also be relevant for the new building of the Bürgerhaus. As part of the separate procurement procedures for the property planning of buildings and the planning of the technical equipment, it is first to be assumed that the new building will be self-sufficiently supplied with energy. Further information will be available in the initial planning phases. The award of the contract is subject to the provision of the corresponding funds in the budget of the municipality of Nonnweiler. The contract will be awarded to the tender with the highest overall score, taking into account the award criteria set out in the Stage 2 scoreboard for the negotiated procedure. The envisaged planning contract, including annexes, can be found in the tender documents. The client reserves the right to limit the commissioning to individual performance levels, to partial performances of individual performance levels or to individual sections of the construction project. The commissioning of the structural design services will be carried out in stages: Performance level 1: performance phases 1, 2; Power level 2: Performance phase 3; Performance level 3: Performance phase 4; Power level 4: Performance phases 5 and 6; Performance level 5: Engineering control during construction. The partial services (basic services, special services, optional services) to be provided in the individual performance levels or performance phases can be found in the Annex ‘Specific performance obligations’ and in the fee form, which are components of the tender documents. Breaks may occur between the individual performance levels due to tests and required approvals. Phases 1 and 2 must be completed no later than 3 months after the order has been placed. The design planning (performance phase 3) including the design document construction (EW-Bau) should be completed within 3 months after the approval of the preliminary planning. The further schedule is developed in coordination between the client and the planning team promptly after commissioning. Upon conclusion of the contract, the client commissions the contractor with the provision of service level 1. If the planning and execution of the construction project continues, the client intends to call up further services individually or in their entirety. There is no legal right to commission further service levels/phases. The contractor is obliged to provide the services of the further service levels if the client entrusts them to him. The contractor cannot derive an increase in his fee from the step-by-step commissioning. It is intended to award the works within the framework of individual trades. The safety regulations for third-party companies must be taken into account. All information on the procurement procedure and an overview of all tender documents can be found in the information brochure. Text automatically translated in your browsing language Automatically translated
https://www.subreport.de/E59884762
https://www.subreport.de/E59884762
Type: quality
Description: 1. Projektorganisation, Koordination, Kommunikation, Präsenz vor Ort: 15% 2. Methodik, Herangehensweise an die Projektaufgabe: 50 % 3. Qualität der Präsentation im Verhandlungsgespräch: 15 % 4. Honorar: 20 % Das Angebot mit dem niedrigsten Netto-Gesamtpreis (gemäß Formblatt Honorarangebot) erhält 10 Punkte. Ein Angebot mit einem höheren Netto-Gesamtpreis erhält einen prozentualen Punktabzug, welcher dem Prozentwert entspricht, um den der Netto-Gesamtangebotspreis über dem niedrigsten Netto-Gesamtangebotspreis liegt. Dabei wird die Punktzahl auf eine Nachkommastelle gerundet. Liegt der Netto-Gesamtpreis eines Angebotes beispielsweise 10 % über dem niedrigsten Netto-Gesamtangebotspreis, so erhält der Bieter (100% - 10%) x 10 = 9 Punkte. Einzelheiten zur Wertung und Wichtung können der Wertungsmatrix Stufe 2 entnommen werden.
Weight (percentage, exact):
This content published on this page is meant purely as an additional service and has no legal effect. The Union's institutions do not assume any liability for its contents. The official versions of the relevant tendering notices are those published in the Supplement of Official Journal of the European Union and available in TED. Those official texts are directly accessible through the links embedded in this page. For more information please see Public Procurement Explainability and Liability notice.