-
Published15/05/2025
-
Deadline02/06/2025
-
Today17/06/2025
Utilities
- indicates CPV codes deduced from the text of the procedure
- indicates text translated automatically in your browsing language
Kouvola-Luumäki construction contract 1 (RU1) (applications for participation) Text automatically translated in your browsing language Automatically translated
The contract area is located in the area of the city of Kouvola and the municipality of Luumäki in connection with the Karelian railway (rail section 1701, Kouvola – Luumäki), on the northern track kmv 228+741 – 249+705. The Taavetti service point kmv 237+952 – 239+679 is not part of the contract area. The contract includes the construction work specified in the contract documents. The main work phases of the contract include: - Replacement work of the cladding structure - Frost protection measures, e.g. replacement, removal and installation of frost sheets - Installation of test blocks, approx. 400 pcs. The location of the installations between Ta-Lä will be specified later. - Broadcasting - Adjustment of the contact wire of the electric railway - Track drainage work - Dismantling of old drums - Installation of new drums - Construction and alteration of service roads - Rock mining - Construction of counter-beds on the northern side of the track - Temporary grounding of new and old rails dismantled from the track in areas where people are moving - Collection of old scrapable rails dismantled from the track and of non-permanent/P-mounted sleepers for disposal. Disposal of old unfit/P-mounted logs. - Rolling and storage of usable rails and sleepers (W14) dismantled from the track. Delivery of rails for storage in Kaipiainen (Voss-loh). - Dismantling and re-installation of hot axle box detectors - Disposal of old logs dismantled from the track, and storage of old logs dismantled for use Other superstructure work: - the contract includes the elimination of Class D and * defects detected by the track inspection wagon (Meeri) (overlay structure and electric railway). In the case of a contract, the percentage of the renewed support layer and the subsidised gears will always be covered by the audit runs carried out before the ex-post support to be carried out in June of the following year. The contractor's obligations and the more detailed content of the contract are stated in the contract plan and the planning documents. Text automatically translated in your browsing language Automatically translated
https://tarjouspalvelu.fi/vayla?id=559364&tpk=c90378f5-9226-4c6d-a7ca-262cc0f205e5
https://tarjouspalvelu.fi/vayla?id=559364&tpk=c90378f5-9226-4c6d-a7ca-262cc0f205e5
45200000 - Works for complete or part construction and civil engineering work
45230000 - Construction work for pipelines, communication and power lines, for highways, roads, airfields and railways; flatwork CVP code deduced from the text of the procedure AI-generated
45234000 - Construction work for railways and cable transport systems CVP code deduced from the text of the procedure AI-generated
Type: price
Description: Halvin hinta
Weight (percentage, exact): 1
This content published on this page is meant purely as an additional service and has no legal effect. The Union's institutions do not assume any liability for its contents. The official versions of the relevant tendering notices are those published in the Supplement of Official Journal of the European Union and available in TED. Those official texts are directly accessible through the links embedded in this page. For more information please see Public Procurement Explainability and Liability notice.