-
Awarded10/06/2011
-
Today16/07/2026
Utilities
- indicates CPV codes deduced from the text of the procedure
- indicates text translated automatically in your browsing language
PL-Kielce: road junction construction work
Investment pn: Construction of a road junction at the intersection of the following roads: The National Army, Iron, Grunwaldskaya, Zhytniej in Kielce includes:
construction of a viaduct over the junction of streets of the National Army, Iron, Grunwaldskaya and Zhyce on the streets of the National Army and Ironna;
refurbishment of the existing viaduct along the road ul. Mielczarski on the street of Grunwaldzka,
— construction of two tunnels for pedestrians on the south side of the street. Grunwaldskaya under railway tracks and under ul. Mielczarski;
− reconstruction of the junction of the streets of the National Army, Iron, Grunwaldskaya, Zhytnij;
− construction of access roads for premises (internal roads);
construction of exits to premises;
− construction of parking stations ul. Rye and streets Iron;
— construction or extension of bus bays in ul. The National Army, Grunwaldskaya, Mielczarski;
— the extension of existing carriageways, pavements and the construction of new carriageways (including connectors and carriageways) of additional crossing lanes, shutdown and switch-off lanes, cycle path pavements, terrain stairways, slipways for disabled people.
− reinforcement of existing surface structures by the laying of a bituminous layer cover or by total replacement of the structure;
— reconstruction and extension of existing sub-road inlets (Armii Krajmia – Karczówkowska, ul. Iron – Golden and ul. Iron – Common).
− demolition of construction works that interfere with the design solution of the road node;
− performance of new horizontal and vertical markings together with refurbishment of traffic lights;
− reconstruction of existing physical infrastructure networks (telecommunications sector (including PKP), NN and SN (including PKP and street lighting), water and sewerage, including rainwater, gas and district heating;
− felling of trees and shrubs and plantings;
— construction of environmental protection equipment (audio acoustic screens).
Scope of design documentation:
— volume I – the road sector,
volume II – sanitation, water, sanitation,
volume III – sanitary industry, rainwater,
— volume IV – electricity industry, reconstruction of PKP power lines,
— volume V – teletechnical industry, reconstruction of PKP’s teletechnical lines,
— volume VI – Electrical industry, street lighting,
— volume VII – electricity industry, refurbishment of power lines,
— Volume VIII – Electrical industry, reconstruction of traffic lights,
— Volume IX – gas industry, reconstruction of the gas pipeline,
— volume X – teletechnical industry, refurbishment of teletechnical lines,
— volume XI – traffic organisation,
volume XII – traffic lights.
The estimated deadline for performance of the contract is 15 months, excluding the period between 15 December and 15 March.
45221243 - Pedestrian tunnel construction work
45221121 - Road viaduct construction work
45233125 - Road junction construction work
45233224 - Dual carriageway construction work
45233294 - Installation of road signals
45330000 - Plumbing and sanitary works
45231000 - Construction work for pipelines, communication and power lines
This content published on this page is meant purely as an additional service and has no legal effect. The Union's institutions do not assume any liability for its contents. The official versions of the relevant tendering notices are those published in the Supplement of Official Journal of the European Union and available in TED. Those official texts are directly accessible through the links embedded in this page. For more information please see Public Procurement Explainability and Liability notice.