-
Canceled10/10/2017
-
Today18/09/2026
Utilities
- indicates text translated automatically in your browsing language
Bulgaria-Sofia: Construction work
The following energy-saving measures are planned for the building located in 13 rd Mart Sredets district in Sofia:
— Energy saving measure 1: Replacement of existing old frames;
— Energy saving measure 2: Thermal insulation of external walls;
— Energy saving measure 3: Thermal insulation of the roof;
— Energy saving measure 4: Thermal insulation of the floor.
The following energy-saving measures are planned to be carried out for the building located in L. Karavelov Street No 6:
The following energy saving measures are planned:
— Energy saving measure 1: Replacement of existing old frames;
— Energy saving measure 2: Thermal insulation of external walls;
— Energy saving measure 3: Thermal insulation of the roof;
— Energy saving measure 4: Thermal insulation of the floor;
— Energy saving measure 5: Repair of electricity installation in common areas and introduction of energy-saving lighting.
This content published on this page is meant purely as an additional service and has no legal effect. The Union's institutions do not assume any liability for its contents. The official versions of the relevant tendering notices are those published in the Supplement of Official Journal of the European Union and available in TED. Those official texts are directly accessible through the links embedded in this page. For more information please see Public Procurement Explainability and Liability notice.