-
Published05/11/2025
-
Today16/11/2025
-
Deadline25/11/2025
Utilities
- indicates CPV codes deduced from the text of the procedure
- indicates text translated automatically in your browsing language
AI 2025- 0220 SMH P1: Mobilteitshub Text automatically translated in your browsing language Automatically translated
Note: Not all information for this procedure were successfully computed. Please consult linked documents for more details.
AI 2025- 0220 SMH P1: Mobilteitshub The Smart Mobility Hub will keep the city, and in particular the ArenAPoort and its events, accessible and offer a solution for international coach traffic and pick-up and drop-off traffic at events (kiss & ride, taxis and AOV). In addition, the SMH will offer a sports park for the De Nieuwe Kern and Zuidoost district and create space for area development and a new sports park for AFC Ajax ‘The New Future’. Furthermore, it offers commercial and social facilities, in line with the sports & mobility programme. The SMH will contribute to creating an easily accessible, healthy, socially safe, climate-adaptive and sustainable environment. The SMH will be realized on grounds of Amsterdam, in the municipality of Ouder-Amstel. The SMH replaces the current event car parks, creating space for De Nieuwe Kern, including the expansion of AFC Ajax's sports park ‘De Toekomst’. The SMH provides for multiple use of the parking capacity for events, office subscriptions, cyclists, visitors, park & ride, kiss & ride, coaches and charging facilities in a future-proof parking building. The building offers space on the roof for an attractive public sports park. The building is optimally part of a new urban fabric between the areas De Nieuwe Kern and ArenAPoort, which means that the building connects with the surrounding (future) bicycle, pedestrian and car networks, green and water structures. The building facilitates a robust settlement of the large quantities and various flows of vehicles, cyclists and pedestrians. The building is spatially and aesthetically optimally integrated into the area development, in accordance with the Structural Vision and urban vision De Nieuwe Kern. The appearance and design of the building contributes to a pleasant and socially safe living environment. Together with the public space, the building forms an attractive transition between the highest ArenAPoort and the future residential area De Nieuwe Kern. The total purchase offer concerns the realization and the long-term maintenance for 15 years of a building consisting of a mobility hub (1), sports park on the roof (2), multifunctional sports accommodation and real estate facilities in the plinth (3), including a winter shelter Text automatically translated in your browsing language Automatically translated
https://www.tenderned.nl/aankondigingen/overzicht/399692
https://www.tenderned.nl/aankondigingen/overzicht/399692
34000000 - Transport equipment and auxiliary products to transportation CVP code deduced from the text of the procedure AI-generated
45200000 - Works for complete or part construction and civil engineering work CVP code deduced from the text of the procedure AI-generated
71000000 - Architectural, construction, engineering and inspection services CVP code deduced from the text of the procedure AI-generated
This content published on this page is meant purely as an additional service and has no legal effect. The Union's institutions do not assume any liability for its contents. The official versions of the relevant tendering notices are those published in the Supplement of Official Journal of the European Union and available in TED. Those official texts are directly accessible through the links embedded in this page. For more information please see Public Procurement Explainability and Liability notice.