-
Published17/08/2026
-
Today06/09/2026
-
Deadline14/10/2026
Utilities
- indicates text translated automatically in your browsing language
N09.56 MP-210003 - St.Maurice - Pont sur le Rhône - Travaux principaux de renforcement du Pont sur le Rhône - St. Maurice (ID 11814)
This contract concerns the preparatory work (VoMa actions) on the Rhône Bridge in Saint-Maurice, located on the N09.56 Bex-Nord – Martigny motorway section. These are two cable-stayed bridges, one per lane, which allow the N09 motorway to cross the Rhône between the tunnels under the Arzillier (right bank) on the Vaud side and the covered slot of Saint-Maurice (left bank) on the Valais side. They require targeted reinforcement and repair measures. Measures include (non-exhaustive list): the reinforcement and protection of the pylons by means of a lining made of ultra-high-performance fibre-reinforced concrete (UHFB), the reinforcement of the pylon heads with a steel box and prestressed cross beams, the insertion of rock anchors into the anchorage blocks of the inclined ropes, the reinforcement of the Valais abutment of the bridge upstream by means of an external preload, as well as the replacement of the bearings, the punctual reinforcement of the steel structure of the longitudinal beams and the anchorage coils of the inclined ropes, the replacement of the restraints on the bridges and their ends.
tdf-non-av
This content published on this page is meant purely as an additional service and has no legal effect. The Union's institutions do not assume any liability for its contents. The official versions of the relevant tendering notices are those published in the Supplement of Official Journal of the European Union and available in TED. Those official texts are directly accessible through the links embedded in this page. For more information please see Public Procurement Explainability and Liability notice.