-
Published15/11/2024
-
Deadline16/12/2024
-
Opening of tenders17/12/2024
-
Today15/03/2025
Utilities
- indicates text translated automatically in your browsing language
Replacement of means for commercial metering of electricity on the territory of "Electrodistribution Grids West" EAD, ref. PPS 24-175 Text automatically translated in your browsing language Automatically translated
‘Electrodistribution Grids Zapad’ EAD conducted an open tender procedure for the award of a public contract for the replacement of commercial metering devices for electricity on the territory of ‘Electrodistribution Grids Zapad’ EAD, ref. RPS 24-175. The subject-matter of the contract was divided into six lots as follows: Lot 1 – ‘Replacement of commercial electricity metering devices on the territory of Operations Centre (OC) Slivnitsa, OC Svoge, OC Botevgrad, OC Samokov, OC Kostenets, OC Pirdop (Sofia District)’; Lot 2 – ‘Replacement of commercial electricity metering devices on the territory of OC Pernik, OC Radomir, OC Breznik, OC Kyustendil, OC Dupnitsa (Pernik District and Kyustendil District)’; Lot 3 – ‘Replacement of commercial electricity metering devices on the territory of OC Blagoevgrad, OC Razlog, OC Sandanski, OC Gotse Delchev, OC Petrich (B Blagoevgrad District)’; Lot 4 – ‘Replacement of means for commercial metering of electricity on the territory of OC Pleven, OC Pleven extra-urban, OC Levski, OC Cherven bryag, OC Gulyantsi (Pleven District)’. Lot 5 – ‘Replacement of commercial metering devices for electricity on the territory of OC Lovech, OC Troyan, OC Teteven, OC Vratsa, OC Byala Slatina, OC Kozloduy (Lovech region and Vratsa region). Lot 6 – ‘Replacement of commercial metering devices for electricity on the territory of OC Montana, OC Lom, OC Vidin, OC Belogradchik (Montana region and Vidin region)’. Each participant may submit a tender for all lots (one or more lots, up to the maximum number of lots under the subject of the contract). The subject of the contract is related to the replacement of commercial metering devices within the meaning of § 1 item 58 of the Additional Provisions of the Energy Act - electricity meters for direct measurement of electricity at low voltage (LV) level and clock switches and replacement of meters with expired periodical inspection, in accordance with the requirements of the Measurements Act. The replacement of electricity meters and clock switches includes the dismantling of existing electricity meters – single-phase (1u) and three-phase (3u) and clock switches and installation of electricity meters – single-phase (1u) and three-phase (3u) and clock switches owned by Electricity Distribution Networks West EAD. JTIs are replaced in all settlements, neighborhoods, villa zones, individual sites, etc., which are powered by electricity and are included organizationally in the territory of a region. The place of performance of the works is the electricity metering panels of household and business users, whose electricity is measured by electricity meters for direct measurement of electricity at low voltage level on the territory of the Merene NV regions of "Electricity Distribution Networks West" EAD. The approach and scope of the JTI replacement process are detailed in the contracting authority’s Technical Specifications and Requirements in Section II. of the procurement documents. Text automatically translated in your browsing language Automatically translated
https://app.eop.bg/today/437126
https://app.eop.bg/today/437126
This content published on this page is meant purely as an additional service and has no legal effect. The Union's institutions do not assume any liability for its contents. The official versions of the relevant tendering notices are those published in the Supplement of Official Journal of the European Union and available in TED. Those official texts are directly accessible through the links embedded in this page. For more information please see Public Procurement Explainability and Liability notice.