-
Published29/06/2026
-
Deadline28/07/2026
-
Today11/08/2026
Utilities
- indicates text translated automatically in your browsing language
TNW _TWP _Zweckverband Wasserversorgung Bayerischer Wald _ Extension Wasserwerk Moos
The Wasserversorgung Bayerischer Wald, a body governed by public law in the form of a special-purpose association, supplies around 500,000 people in 7 districts with drinking water. Water production is based on two pillars, the Frauenau drinking water dam and the Brunnenfeld near Moos. For more information, visit www.waldwasser.eu. The existing waterworks in Moos was rebuilt in 2018. The performance of the waterworks is now to be expanded. A second processing building has to be built for this purpose. The new treatment building will be built next to the existing one and includes the complete treatment technology, control, medium voltage and emergency power supply It will be technically connected to the existing waterworks. In the course of this invitation to tender, the basic services of the performance phases 1-6 of the performance diagram Structural design (§ 51 HOAI in conjunction with Annex 14 No 14.1) as well as the special performance of the engineering control of the execution of the structural design for compliance with the tested static documents (performance phase 8 object monitoring) will be commissioned in stages.
https://www.dtvp.de/Satellite/notice/CXP4YHYMXN0
https://www.dtvp.de/Satellite/notice/CXP4YHYMXN0
This content published on this page is meant purely as an additional service and has no legal effect. The Union's institutions do not assume any liability for its contents. The official versions of the relevant tendering notices are those published in the Supplement of Official Journal of the European Union and available in TED. Those official texts are directly accessible through the links embedded in this page. For more information please see Public Procurement Explainability and Liability notice.