-
Published16/03/2011
-
Deadline28/04/2011
-
Opening of tenders28/04/2011
-
Awarded30/06/2011
-
Today25/09/2026
Utilities
- indicates text translated automatically in your browsing language
PL-Zamość: waste-treatment plant construction work
Designing, constructing, equipping and launching the Dębowcu Regional Waste Management Plant, co-financed by the European Union – Cohesion Fund under the Operational Programme Infrastructure and Environment 2007-2013.
Priority: II – Waste management and land protection.
Action: 2.1 – Comprehensive municipal waste management projects with a particular focus on hazardous waste.
The procedure is conducted on the basis of the Public Procurement Act of 29.1.2004 (i.e. Journal of Laws Journal of Laws 2010, No 113, item 759, as amended) (hereinafter: Pp) by means of an open tender procedure pursuant to Article 10. 1.
The contracting authority shall provide for the possibility of awarding complementary contracts as referred to in Article 67(1). 1 point 6 of the PPL (up to 10 % of the value of the basic contract).
The main technological and technical segments of the plant.
— Waste reception, registration and registration segment,
— Waste sorting segment,
— Crushing segment,
— Composting segment,
— The disassembly/stressing segment of construction and bulky waste,
— The temporary storage segment of hazardous waste,
— A place of temporary deposit of construction waste, bulky,
— Ballast deposit segment,
— Workshop segment for plant equipment and sanitary facilities,
— The administrative segment,
— Access road,
— In-house manoeuvring roads and manoeuvring places,
— Monitoring system,
— Rainwater management system,
— In-house networks and installations.
This content published on this page is meant purely as an additional service and has no legal effect. The Union's institutions do not assume any liability for its contents. The official versions of the relevant tendering notices are those published in the Supplement of Official Journal of the European Union and available in TED. Those official texts are directly accessible through the links embedded in this page. For more information please see Public Procurement Explainability and Liability notice.