-
Awarded02/05/2025
-
Today20/06/2025
Utilities
- indicates text translated automatically in your browsing language
(ProVia-ID 120823) Integration test of the Zelisko ZRaiLED 20W on MSTT control in the SIMIS AT ECC interlocking Text automatically translated in your browsing language Automatically translated
ÖBB-Infrastruktur Aktiengesellschaft has interlockings of the type MSTT control in the SIMIS AT ECC interlocking, which are equipped with Zelisko ZRaiLEDs 20W light points. In order to keep these interlockings in proper and safe operation over the service life, it is necessary to carry out an integration test of the Zelisko ZRailLED 20W light points in order to detect any weak points, eliminate them and subsequently ensure a generic report on the integrity of the existing light points ZRaiLED 20W as well as the new generation of light points to the interlockings. Optionally, the power is also required for 35W light points. These services can only be provided by the contractor due to a technical speciality as well as due to exclusive rights within the meaning of § 206(1)(4)(a) and (b) BVergG 2018. Text automatically translated in your browsing language Automatically translated
This content published on this page is meant purely as an additional service and has no legal effect. The Union's institutions do not assume any liability for its contents. The official versions of the relevant tendering notices are those published in the Supplement of Official Journal of the European Union and available in TED. Those official texts are directly accessible through the links embedded in this page. For more information please see Public Procurement Explainability and Liability notice.