-
Zveřejněno04/07/2012
-
Lhůta06/08/2012
-
Udělení zakázky21/06/2013
-
Dnes05/09/2026
Nástroje
Spojené království/Velká Británie-Sandbach: Stavební úpravy pro komunikace
The Design and Construction of 1.1Km long dual carriageway, providing a link south of Crewe that will reduce congestion in the area and open up development land. The new highway links into two existing roundabouts to the north and south of the scheme, and creates a new roundabout at the mid point to provide access to development land on either side of the road.
The scheme also involves the highway passing beneath an existing railway line, which necessitates the construction of a new bridge to carry the railway over the new highway. This will involve rail possessions and temporary closure of the line to undertake the works.
Poštovní adresa: Kent House 14 – 17 Market Place
Obec: London
PSČ: W1W 8AJ
Země: GBR
Obsah zveřejněný na této stránce je považován pouze za doplňkovou službu a nemá žádný právní účinek. Orgány Evropské unie nenesou za obsah stránek žádnou odpovědnost. Oficiální znění příslušných oznámení o zadávacím řízení jsou ta, která jsou zveřejněna v dodatku Úředního věstníku Evropské unie a jsou k dispozici v TED. Tato oficiální znění jsou přímo dostupná přes odkazy uvedené na těchto stránkách. Více informací najdete v oznámení o vysvětlitelnosti a odpovědnosti při zadávání veřejných zakázek.